Contact
- London
- Belfast
- Glasgow
- Bristol
- Birmingham
A complex retail redevelopment on a prominent site along the main route through Aberfeldy. The project involved the demolition of existing retail and garage structures, followed by the construction of a new retail unit and the reconfiguration of an existing Petrol Filling Station (PFS).
Key construction elements included the formation of a lowered service bay and installation of a retaining wall, alongside full internal fit-out works to prepare the unit for final sales installation. The project also required an early handover of the reconfigured PFS to ensure business continuity and minimise disruption to operations.
The development was delivered within a highly constrained site footprint, with the new building extending to the boundary on two sides and integrating with an existing structure on the third. Maintaining full operational functionality of the petrol station throughout construction demanded meticulous phasing, coordination, and strict adherence to safety protocols.