Contact
- London
- Belfast
- Glasgow
- Bristol
- Liverpool
The works included the full strip-out and part demolition of the existing car showroom. The space was subdivided into 2 new areas to form interlinked showrooms for both the Bentley and Aston Martin brands.
The existing heating system was removed and replaced with a new modern system, whilst the complete curtain walling system was removed and upgraded to include entrances. External parapet, signage, cladding and over-cladding was also completed with a new car park layout, landscaping and totem signage completing the external works.
Whilst the showroom staff decanted to a separate building, the existing busy multi-brand workshop to the rear of the showrooms remained fully operational and accessible during the 16-week period.
The high-class finish in both showrooms included strip lighting, feature walls and travertine floors and walls.