Contact
- London
- Belfast
- Glasgow
- Bristol
- Birmingham
The works included the full strip-out and part demolition of the existing car showroom. The space was subdivided into two new areas to form interlinked showrooms for both the Bentley and Aston Martin brands.
The existing heating system was removed and replaced with a new modern system, whilst the complete curtain walling system was removed and upgraded to include entrances. External parapet, signage, cladding and over-cladding was also completed with a new car park layout, landscaping and totem signage completing the external works.
Whilst the showroom staff decanted to a separate building, the existing busy multi-brand workshop to the rear of the showrooms remained fully operational and accessible during the 16-week period.
The high-class finish in both showrooms included strip lighting, feature walls and travertine floors and walls.